This scaffolding was erected inside the United Reform Church in Clitheroe - a section of the existing plaster ceiling had fallen away and needed to be made safe. The ceiling was approximately 40ft above ground level and access was made more difficult with the position of the pews.
Email: info@rosslee.co.uk
Rosslee Construction
Black Abbey Street
Accrington
Lancashire
BB5 1HT
Click on the individual pictures to enlarge
Terms & Conditions Privacy | Copyright |Disclaimer | Site map
©R Developments Ltd 2010 All Rights Reserved
You are viewing the text version of this site.
To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.
Need help? check the requirements page.