Value: £650k                      Client: St Cuthbert’s High School

Rosslee were awarded the contract to build a new SEND facility at the existing high school in Rochdale.

This construction is a single story, stand-alone block consisting of 4nr classrooms, reception area, offices and toilet facilities.

The construction method was a steel frame building, sat on reinforced beam foundations on piles, with the external walls of block work and brick cavity, and the roof is a metal deck with insulation between the layers.

Internally the walls are metal stud partitions, and then boarded and skimmed, with ceiling grids to all rooms, and the scheme was then fully decorated and floored throughout.

All new Mechanical and Electrical services were installed throughout, and were fed from the adjacent building of the main school, with all data and security systems linked to the school infrastructure.